Dam building and dam desilting for Gympie farms

Silted-up dam holding half of what it used to? We desilt existing dams and build new ones, shaping the walls and batters so they hold water and stand up to weather.

Completed Corella farm dam viewed along the shaped wall and spillway toward the water

What's included

  • New farm dam construction, sized to your catchment
  • Desilting and deepening existing dams
  • Wall, batter and spillway shaping
  • Silt spread or stockpiled where you want it
  • Stock and irrigation dam repairs

Dam Building & Desilting jobs we've done

Silted farm dam at Corella QLD before pumping and excavation

Corella, QLD

Silted dam desilted and cleaned out

The dam was pumped out and accumulated silt excavated, giving it a fresh start to hold water for stock.

Undercut dam wall hidden by weeds and regrowth before repair works at Curra QLD

Curra, QLD

Dam wall repaired

A damaged and eroded dam wall repaired, rebuilt and reshaped so the dam could hold water properly again.

Newly built farm dam with shaped walls holding water on a Glastonbury property near Gympie

Glastonbury, QLD

Farm dam finished and holding water

Dam walls and batters shaped up and the surrounds graded off — a clean finish that holds water and sheds runoff the right way.

See all our work

Need dam building & desilting done?

Tell us the job and the location and we'll come back with a straight number. For anything sizeable we'll come out and look first.